Homepage
Spanish
Chinese

Waste Water Treatment Plant Salvages "Unsalvageable" Pump Suction Housing with CeramAlloy

At a waste water treatment facility in Florida, a severely eroded and corroded pump suction housing was repaired, saving time and money.  The approximate cost to manufacture a new housing to spec was around $10,000 with a 14 week lead time. Less than $1,000 worth of CeramAlloy was used to repair this pump and it took only one day!

1
2
3
4
5
6

Ask an ENECON Tech

Fill out my online form.