Homepage
Spanish
Chinese

Shower stalls present a serious maintenance problem.

In hospitals and hotels, rooms cannot be occupied if the bathrooms are not operational. In hospitals, this means reduced patient care; in hotels lost revenue. Schools, Universities and commercial buildings also have these problems.

The problems are many:

The typical replacement process involves demolition, removal and replacement of the pan and tiles. This time consuming (several days), noisy and takes the entire bathroom [and associated bedroom] out of any service during the entire process.

ENECON solution:

Repair and seal the pan, grout and tiles, adding anti-slip as needed using any of several of our high performance polymers.

  1. METALCLAD DurAlloy™ - polymer paste to seal cracks, gaps in grout, around drains etc.
  2. CHEMCLAD GP™, XC™ - polymer liquids to create a seamless overall coating, adding anti-slip grit as needed.

Advantages:

  • Quick turn-around, usually no more than two days AND
    • No odors; even in hospitals, patients can remain in the room except for the short surface-prep time.
    • The toilet and sink may still be available for use at night and non-work hours.
  • Anti-slip enhanced by adding granules (grit or glass beads) into the surface coating.
Existing coating has degraded with sharp edges, making the shower unsafe.

Existing coating has degraded with sharp edges, making the shower unsafe.

Loose coating removed, remainder ground smooth.

Loose coating removed, remainder ground smooth.

Rebuilt, resurfaced shower with anti-slip glass beads added.

Rebuilt, resurfaced shower with anti-slip glass beads added.

Ask an ENECON Tech

Fill out my online form.