Jun 12
2013
by ENECON
Picture if you will, one of those ramp structures over a busy highway that looks like an octopus with many on-ramps, off-ramps, loops, and curves. The Department of Transportation had some very specific needs. They had conducted a two-year rust-through test that of course we passed. They also had another unusual requirement. They wanted us to match a specific color.
We matched the color for over 300 thousand square feet of bridge box supports using ENESEAL CR. Now the highway exchange bridge supports are protected and look good as well.
Custom color wins the work to coat busy highway exchange