Homepage
Spanish
Chinese

HVAC Maintenance

HVAC Chiller Maintenance

As you open your chillers for inspection, finding significant erosion and corrosion damage on uncoated systems is almost inevitable.

Contact us to schedule a free chiller maintenance inspection. ENECON products can provide long term protection from corrosion ... Read More...

Commercial Roof Repair

Temperatures are rising and summer is right around the corner. Too often we overlook one of the most important parts of our facility, the roof. Commercial facility roofs are in the elements 24/7/365 and sustain damage from: rain, hail, snow, sun, animal waste, chemical attack, and changes in temperature.

Over time, high temperatures can cause blistering and cracks, which allows ... Read More...

Francis Turbine Wicket Gate

These wicket gates for a Francis turbine direct high flowing water so that it hits the turbine blades at the most efficient angle. When not properly protected, these wicket gates suffer from constant erosion / corrosion. The majority of companies will discard their worn out wicket gates and then purchase very expensive new gates for their Francis turbine.

Read More...

Roller Resurfacing

When machinery and equipment are inoperable and must be repaired frequently, it costs a company time, revenue and manpower. A major corrugated carton manufacturer in Columbia was continuously stopping production in order to repair their equipment. The manufacturer had to resurface their production rollers every 30 days. These constant repairs were necessary because if the roller diameters ... Read More...

Concrete Footer Repair

One of the challenges building and facility managers face on an almost daily basis is how to keep the key components of their aging facilities operating economically. Often replacing a component isn’t possible due to the way the building is constructed around the part in question. Also, often the timeframe to get a new one isn’t practical. Even when a new component is available, ... Read More...

Pintle Housing Repair

ENECON recently completed a project on a Military Sealift Command ship. The ship is a RO/RO (roll on/roll off), 954 feet long and a beam (width) of 106 feet. It is triple screw and has a displacement of 61,680 tons.

Once dry-docked, the rudder was removed along with the associated hardware ... Read More...

Weather Protection Coating

These test panels were partially coated with ENESEAL CR so a small section of the test panels on the top and bottom were left uncoated.

One of the test panels from the set was placed on an outside test fence and remained exposed to the weather continuously for approximately nine years. The other test panel was stored continuously in the ENECON Laboratory without exposure to the ... Read More...